Legrand RC4KTCBK Uživatelský manuál Strana 3

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 4
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 2
Step 9. Make electrical connections in junction box Step 10. Wiring Diagram. Connect receptacle leads
according to wiring diagram. to branch circuit conductors as required.
WARNING: Ground wire from junction box must be connected
to SYSTEM GROUND.
CAUTION: Receptacle mounting means not grounded.
Grounding wire connection required. For isolated
ground wiring, connect ground leads to a separate
isolated grounding conductor See NEC250-146(d).
Step 11. If circuit is connected to an isolated ground, apply IG icon on receptacle slide as shown.
NOTE: The orange triangle shall only be placed on devices
that are wired for isolated ground. See NEC 250-146(d).
Circuit “B”
Circuit “A”
Circuit “A” Circuit “B”
Line Black Red
Neutral White White w/Blue Stripe
Ground Green Green w/Yellow Stripe
Electrical Wiring Chart
NOTE: Factory supplied junction box shown. Junction boxes
must be located in an accessible location. Poke-Thru
devices with an “LJB” or “LJB25” suffix are supplied
without a junction box (supplied by others).
Zobrazit stránku 2
1 2 3 4

Komentáře k této Příručce

Žádné komentáře